Tuesday, 31 October 2017

Idea Update:

Lauryn and I have decided to abolish the initial idea of using double-exposure effect for the TV studio shoot as we have been informed by our teacher that it is too ambitious and will require many attempts, we therefore have mutually agreed to continue with the idea of projection art instead.

Our initial ideas presented in our pre-production proposal

Monday, 30 October 2017

Progression Post: Gathering Our Footage

The majority of the footage for the music video has been shot and we have created files and backed them up, however we are intending to complete our third and final shoot of the male actor which is to be filmed in the college TV studio the following Thursday. We have compiled the majority of the video on the editing software (Premiere Pro CC), this is running smooth and so far we have had no complications with the audio or the visuals.

Research and Planning Task

Created using Visme. Free Online Presentation Software.

Saturday, 28 October 2017

Teachers Blog Feedback

The feedback given regards minor issues- which included the ethical considerations of our music video as well including a signed release form (which is just a matter of scanning it for proof), both of these improvements were made as they are straightforward to complete.



Tuesday, 24 October 2017

Planning Research and Planning Task

I have now created the skeleton for for this task and now need to transfer the content to a creative technology and the deadline for this is the 30th of October, which gives me just under a week.

Sunday, 22 October 2017

Lesson Update:

Our class discussed the codes and conventions of editing as this is the current position for most of us A2 media students. Previous Exemplar music videos of last years students were showcased, we discussed the positive elements as well as the negatives which I noted to try and incorporate and subvert this into my own project.

Monday, 16 October 2017

Weekly Meeting Objective:

To get a head start on editing the music video as well as creating folders for the footage and backing them up. Considering the fact that the majority of footage is completed I wish for my partner and I to get a head start on the foundation of the music video which has been planned out on a story board template as part of our pre-production. 

Leake Street Video Shoot (2) Evaluation

According to the tight production schedule, the meet-up time was 12:00, which happened without any dilemmas or issues, however the timing appeared to take a left turn during the preparation of doing our model, Sharn's makeup, we underestimated the time on the production schedule which caused us to be slightly delayed. On a more positive note, the makeup was coordinated with the outfit which was flattering the dark red theme was therefore continuous and gave a nice, consistent touch to the outcome. We went through a few practice runs to get in the mood and feel less restricted as well as adjusting the lighting and camera angles to suit Sharn. The video shoots ran smoothly and were impressed with the outcome, however we noticed that the borrowed college DSLR cameras were running low on power and we had already gone through one battery pack and therefore only had one more to spare. This lead us to rush and I feel as if it limited our potential, nevertheless we decided to prioritise the music video shots as it is the main element as we wished for it to be in the best quality. The camera eventually died, however we were fortunate as Lauryn had brought her Sony camera to film the 'behind the scene' shots. This enabled us to progress and shoot the CD cover still images which went well. Despite the delays, the day was successful and permitted us to make the most of the one day with our model and gather all our footage.

Behind the Scenes: Leake Street Video Shoot






Leake Street Video CD Photography Shoot

Sunday, 15 October 2017

Music Video Team Conformation Email


The emails with the crew introduced the concept and confirmed dates as the treatment and time schedule were attached, therefore the team had a clear understanding of the expectations for the pace and effort, hopefully resulting to an organised, structured day of shooting.



Saturday, 14 October 2017

Photo/Video Shoot (1)- Shoreditch & Hackney Wick Evaluation

In order to have a wide selection and compiled range of graffiti shots to include in the music video, we took some shots in Shoreditch and hackney which was successful. The production schedule was helpful as it enabled my partner and I to be on track with shooting the locations with the same lighting as if it were to continue any longer the photos will vary with lighting as we decided to use natural lighting as it was mostly outdoors and didn't want to over-expose the shots. Overall, Lauryn and I were satisfied with shots and are prepared for tomorrows main video shoot. 


Wednesday, 11 October 2017

A2 Music Video Inspiration

As preparation for shooting the video footage, I watched multiple media student videos that are claimed to be marked highly-this enabled me to have a clearer understanding of expected quality and standards. I also observed  areas that work well as well as areas that could be improved from the point of view of a regular viewer. I also stumbled across students with a similar project as ours which features a performance based video with an urban aura as well as projections, this permitted me to broaden my knowledge and gain inspiration as the videos have the creative expression I wish to achieve. A feature that appeared to be a common trend in the student music videos were the channel style introduction and break bumpers, for example the MTV logo and song intro before displaying the song video itself. This feature adds a sense of professionalism and realism and therefore I plan to include it into my own.

Production Schedule

Schedule 1:
Time
Location/Action Plan
12:00
Whole Crew Meeting: Sunday 15th October: Leake Street
12:10
Sharn’s makeup completed by Aretha
12:40
Shoot commencing- whole song filmed X2 (Leake Street)
13:00
Break
13:30
Leake Street shoot continues x2
14:00
Photoshoot in Leake Street
15:00
Lunch Break
16:30
Westminster Shoot filming with song X2
17:15
Westminster Photo Shoot
17:45
WRAP- All on-set crew leave
18:00
Get footage of Leake street graffiti
19:00
End of day




Schedule 2:
Time
Location/Action Plan
12:00
Meeting: Saturday 14th October Hackney Cambridge Heath Road
12:05
Shoot commences
12:35
Make route to Hackney Wick
13:05
Arrive at Hackney Wick
13:10
Break
13:30
Shoot Commences
15:00
Break
15:30
Shoot continues
16:30
Shoot ends-Day over

Monday, 9 October 2017

Plans for Shooting Week Commencing 9th October

Lauryn and I have planned a convenient shooting weekend which will enable us to produce the majority of the shots for our project. On the Saturday approaching we will film our graffiti walls and urban art in Hackney using the colleges professional Cannon DSLR cameras as well as a tripod for stability. We plan to gather plenty of footage and then eliminate the videos we no longer want, therefore only using the best of our footage. This day will almost act as a 'trial run' and heads-up for the day after- where Sharn, our lip sync performer will be filmed in Leake Street and Westminster Bridge. This plan works out more convenient and time-efficient considering our actress is only available for one full day. Therefore we will have prior knowledge and would have discussed the day through in depth as well as being more confident in shooting the video.

Pre-production: Copyright Clearance

DefinitionCopyright Clearance. Clearing copyright means the act or process by which a person ensures a proposed use of materials is in compliance with copyright law.

Pre-production: Westminster Bridge Recce

Pre-production: Leake Street Recce

Pre-production: Hackney Recce

Group Meeting (2)



LEYTON SIXTH FORM COLLEGE

Media Studies Team Meeting
Attendees Lauryn Reid & Layla Abdi 

Date of Meeting: 3rd of October   Time Start: 10:30am Time Finish: 10:40am     Date of Next Meeting: 4th of October 2017    Time of Next Meeting: 11:50am 

Topic
Summary of Discussion
Decision
Action by

Pre- Production Responsibilities 


What has now been completed and what’s left yet to do.
I will complete a presentation on Google Slides on the costume, props and make-up planned to be included into our music video. 
Lauryn will be competing the 3 call sheets for each day that we plan to shoot. 
Should be completed by next media lesson – 4thof October. 

Recces during lesson 


To get permission by our Thursday media lesson teacher, whether or not we are allowed to do one of our location recces during the lesson. 
We will email our teacher – Esther, on if she gives us permission to do so. 
We should receive a answer from Esther by tomorrow – Wednesday 4th of October.

Thursday, 5 October 2017

Group Meeting (4)

LEYTON SIXTH FORM COLLEGE

Media Studies Team Meeting
Attendees Lauryn Reid & Layla Abdi

Date of Meeting: Thursday the 5th of October 2017          Time Start:   3:10pm                          Time Finish: 3:20pm               Date of Next Meeting: Monday the 9th of October 2017         Time of Next Meeting: 9:30am 


Topic
Summary of Discussion
Decision
Action by

Pre-production responsibilities


Recces 1 &2 - Lauryn and I took photographs of one of the locations we are planning to shoot at - Hackney Wick.  
We then planned to do our second recce - at Leake Street will be done on Friday the 6th of October 2017 
I took the photos with my camera and will be again for our Leake Street recce. 
I will be uploading the photographs as a Google Slide for both recces. 
Monday the 9th of October 2017

Wednesday, 4 October 2017

Pre-production: Location Release Form



Location Release Form
Production Title: A2 Media Studies Music Video – Bet You Wish
Producer: Lauryn Reid and Layla Abdi
Contact number/ Email: Lauryn – 07904030159/ laurynreid55@gmail.com


Name of Location: College Studio 
Address of location: Essex Road, Leyton, London E10 6EQ 

I have received details from …………………………………………………….(student name) concerning the above location.  I am willing to give permission for use of the location to film a student project, under the following conditions:

The Premises will be made available for (date/time)………………………
We shall ensure that the Premises are left in good order after use.  We agree that we shall be responsible for any loss or damage directly arising from our use of the Premises.

Name (please print)………………………………………………………………………………………………….
Contact Details ………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
Signed………………………………………………………………………………………………………………………….

Pre-production: Actors Release Forms



Talent Release Form
Production Title: A2 Media Studies Music Video – Bet You Wish 
Producer: Lauryn Reid and Layla Abdi 
Contact number/ Email: Lauryn – 07904030159/ laurynreid55@gmail.com

I ………………………………………………………………agree to the use of the video of myself being carried out by Media students from Leyton Sixth Form College in the production named above.

I understand that in return for work on the production I will receive:
Copy of Music Video by 27th of November 2017 

Actor:
Signed………………………………………………………………………………………
Name…………………………………………………………………………………………………………………………
Date…………………………………………………………………………………………………………………………
Contact details………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………

Student/s:
Signed………………………………………………………………………………………………………………………….
Name/s……………………………………………………………………………………………………………………….
Date……………………………………………………………………………………………………………………………..

Contact details……………………………………………………………………………………………………….

Group Meeting (3)

LEYTON SIXTH FORM COLLEGE

Media Studies Team Meeting
Attendees Lauryn Reid & Layla Abdi

Date of Meeting: Wednesday the 4th of October 2017          Time Start:   11:50am                    Time Finish: 12:00pm                          Date of Next Meeting: Monday the 9th of October 2017      Time of Next Meeting: 9:30am 


Topic
Summary of Discussion
Decision
Action by

Pre-production responsibilities


What is left for us to complete and who will complete what
I will complete the release forms for our 2 actors, ready to be signed when we see them. 
Lauryn will be completing the actors that we plan to include - pictures with their profiles.
Thursday the 5th of October 2017

Pre-production: Actor Profile & Plans


Pre-production: Call Sheets

Call Sheet 1:  Hackney Wick 

Production: Bet You Wish

Production company: Lauryn Reid & Layla Abdi
Co-Producer: Lauryn Reid & Layla Abdi
Director: Lauryn Reid & Layla Abdi

Crew  Call: 12:00
Estimated wrap: 17:00
Shooting  Date: 14/10/2017

Location:

Hackney Wick, London E9 5EF
Location contact: Lauryn-07904030159

*** NO SMOKING ON ANY SET ***
SET

*SCENES

PAGES

CAST  Nos

LOCATION
Hackney Wick Street Art
Verse 1, Chorus and verse 2
-
-

Hackney Wick, London E9 5EF






NO.
ARTISTE
CALL TIME
MAKE-UP
REMARKS

1

Lauryn Reid and Layla Abdi

12:00
N/A
Own transport to location

CAMERA / LIGHTING
PROPS / DESIGN

Natural Lighting

Camera- DSLR including Tripod
Graffiti, urban background and ambience
COSTUME / MAKE UP
CATERING
N/A
Water will be provided

NOTES:
We will include frequent breaks and assessing of footage to reach our standards of satisfaction


Call Sheet 2: Leake Street/ Westminster Bridge
Production: Bet You Wish 
Co-Producer: Lauryn Reid & Layla Abdi
Director: Lauryn Reid & Layla Abdi

Crew  Call: 12:00
Estimated wrap: 18:00
 Shooting  Date: 15/10/2017

Location: Leake Street, Lambeth, London SE1 7NN & Westminster Bridge. London SE1 7GL 
Location Contact: Lauryn - 07904030159 

*** NO SMOKING ON ANY SET ***

SET
Scenes 
PAGES
Cast Nos
LOCATION
Leake Street
Verse 1, Chorus and Verse 2
-        
1
Leake Street, Lambeth, London SE1 7NN

Westminster Bridge

The Outro of the Song
-        
1
Westminster Bridge, London SE1 7GL

NO.
ARTISTE
CALL TIME
MAKE-UP
REMARKS
1
Sharn April
12:00
12:30
  Own transport to location.

CAMERA / LIGHTING
PROPS / DESIGN

Natural Lighting
Camera - DSLR with a tripod 
-  
COSTUME / MAKE-UP
CATERING
Fashion Stylist: Cian Smith 
Bomber Jacket
Trainers
Casual Jeans
Crop top/jumper 
Make-up Artist: Aretha Fontaine 
 Water will be provided 
  

NOTES:
We will film all our footage at Leake Street for 12:00 – 16:00 – Included with a break in-between. We will then change locations to Westminster Bridge until 18:00.












Call Sheet 3: LSC Studio
Production:  Bet You Wish
Co-Producer:
Lauryn Reid & Layla Abdi

Director:
Lauryn Reid & Layla Abdi


Crew  Call:
Estimated wrap:
Shooting  Date: Week commencing the 16th of October 2017


Location: Essex Road, Leyton, London E10 6EQ 

*** NO SMOKING ON ANY SET ***


SET

Scenes: 
PAGES

Cast Nos
LOCATION

Studio 
Verse 1, Chorus, Verse 2 and Outro 
 - 
1
Essex Road, Leyton, London E10 6EQ 



NO.
ARTISTE
CALL TIME
MAKE-UP
REMARKS

 1
 Aaron 

 -



CAMERA / LIGHTING
PROPS / DESIGN

Camera - DSLR with tripod
Lighting equipment  
Projections on backdrop - object/images associated with music video theme. 

COSTUME / MAKE UP
CATERING

Puffer jacket
Black clothing



Water will be provided 



NOTES:

This shoot will be filmed in our college studio.